The 2021 edition of the approved document outlines an important requirement that could result in a significant increase in hardware and installation costs. By using Lutron's lighting controls, it is possible to easily meet these requirements:

  • Use high end trim to avoid spaces being over-illuminated (comply with clause 6.59)
  • Where there is low traffic, incorporate absence detection for automatic shutoff.
  • Where there is high traffic, incorporate presence detection for automatic shutoff.
  • In shared spaces, incorporate timeclocks to turn lighting off after-hours.
  • Where there are windows, incorporate a daylight sensor for automatic dimming.
  • Use wireless controls and detectors for easy placement and flexible control.

As outlined on clause 6.61, general lighting should be metered by one of three methods:

  1. Dedicated lighting circuits with a kWh meter for each circuit.
  2. Local power meter coupled to, or integrated in, the lighting controllers of a lighting management system.
  3. A lighting management system that can both:
    i. calculate the consumed energy
    ii. make this information available to a building management system.

Lutron product capabilities to meet Part L requirements

Lutron Product Capabilities to meet Part L requirements

Why Invest in Lighting Controls?

Occupant comfort — Increased productivity and well being
Meet demand — Lighting controls are growing in popularity to improve the aesthetics, functionality, and value of any space
Increase revenue — Lighting controls provide an additional revenue opportunity for the contractor
Comply with building regulations — Evolving rules are requiring stricter requirements for energy efficiency, while allowances are also being made for lighting controls

Why Lutron?

  • Proven technology: 2,500 active patents
  • Upfront project service support
  • After-sales support
  • Reduced end-user call-backs
  • Products designed and manufactured for reliability with 100% pre-shipment inspection
  • Significant portfolio to cover all your project requirements: +15,000 SKUs
Jun 06 2022 | General